
Overview
About AS Industrie- und Immobilienservice
Who we are
Production and installation of industrial plants. Pipeline construction, steel and metal construction
Vorwerk, Germany
Member since 2019
Employees10 - 20
Certificates1
Turnover< 1 Mil.
Year of foundation2012
Competencies
Technologies
Welding
| Technologies | Lotsize | Length | Width | Height | Diameter | Weight | Material thickness |
|---|---|---|---|---|---|---|---|
Inert gas shielded arc welding (MIG/MAG) | 1–1,000 | 1–6,000 mm | 1–2,000 mm | 1–2,000 mm | — | 0–300 kg | — |
Inert gas shielded arc welding (TIG) | 1–1,000 | 1–6,000 mm | 1–2,000 mm | 1–2,000 mm | — | 0–300 kg | — |
Manual electrode welding | 1–1,000 | 1–2,000 mm | 1–2,000 mm | 1–2,000 mm | 1–2,000 mm | 0–300 kg | 1–25 mm |
Assembly
| Technologies | Weight |
|---|---|
Mechanical assembly | 0–300 kg |
Electromechanical assembly | 0–300 kg |
Industrial / On-site-assembly | 0–300 kg |
Welded constructions / Structural Steelwork
| Technologies | Length | Width | Height | Weight |
|---|---|---|---|---|
Welded constructions (weldments) | 10–6,000 mm | 10–2,000 mm | 10–2,000 mm | 0–300 kg |
Machine frames / bases / racks | 10–6,000 mm | 10–1,500 mm | 10–2,000 mm | 0–300 kg |
Mechanical Engineering
| Technologies | Lotsize | Length | Width | Height | Weight |
|---|---|---|---|---|---|
Apparatus engineering | 1–1,000 | 5–2,000 mm | 5–2,000 mm | 5–2,000 mm | 0–300 kg |
Tool building | 1–1,000 | 1–2,000 mm | 1–2,000 mm | 1–2,000 mm | 0–300 kg |
Materials
Light metals
Aluminium and aluminium alloys
Steel
Structural steelStainless steel (rust-proof V2A)Stainless steel (rust-proof V4A)
Industries
Plant engineering and construction
Certificates
No certificates
Parts & Machines
Machinery (5)
1 / 5
AC/DC 230
ManufacturerEWM
ControlComfort
Year of Construction2017
Technology
Apparatus engineeringWelded constructions (weldments)Machine frames / bases / racksInert gas shielded arc welding (MIG/MAG)Manual electrode weldingTool buildingMechanical assemblyIndustrial / On-site-assemblyInert gas shielded arc welding (TIG)Electromechanical assembly
2 / 5
T250 DC
ManufacturerLorch
ControlPro
Year of Construction2010
Technology
Mechanical assemblyApparatus engineeringTool buildingInert gas shielded arc welding (TIG)Industrial / On-site-assemblyInert gas shielded arc welding (MIG/MAG)Welded constructions (weldments)Electromechanical assemblyMachine frames / bases / racksManual electrode welding
3 / 5
Picomog 355 Puls
ManufacturerEWM
ControlComfort
Year of Construction2019
Technology
Inert gas shielded arc welding (MIG/MAG)Machine frames / bases / racksWelded constructions (weldments)Apparatus engineeringTool buildingElectromechanical assemblyIndustrial / On-site-assemblyMechanical assembly
4 / 5
Bandsäge SAW S 131 GH
ManufacturerOptimum
ControlManual
Year of Construction2015
Technology
Machine frames / bases / racksApparatus engineeringWelded constructions (weldments)Tool buildingIndustrial / On-site-assembly
5 / 5
Standbohrmaschiene
ManufacturerOPtimum
ControlManual
Year of Construction2015
Technology
Electromechanical assemblyMechanical assemblyIndustrial / On-site-assemblyTool buildingApparatus engineeringWelded constructions (weldments)Machine frames / bases / racks
5 Machinery
Apparatus engineering5
Welded constructions (weldments)5
Machine frames / bases / racks5
Inert gas shielded arc welding (MIG/MAG)3
Manual electrode welding2
Tool building5
Mechanical assembly4
Industrial / On-site-assembly5
Inert gas shielded arc welding (TIG)2
Electromechanical assembly4
Are you a supplier?
Find perfectly matching requests.
Are you a buyer?
Submit your request.